Sync vault notes: April-November 2026 sessions, projects, and architecture
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
fe4fe656be
commit
994c7ae577
379 files changed
+55216
-107
No files matched your search
@@ -0,0 +1,78 @@
|
||||
---
|
||||
status: ACTIVE
|
||||
---
|
||||
# CEO Plan: Lodge-First Launch — Beta Spine + Competitor Intel
|
||||
Generated by /plan-ceo-review on 2026-06-10
|
||||
Branch: main | Mode: SELECTIVE EXPANSION
|
||||
Repo: garfield/hermes-mcp (git.fetcherpay.com)
|
||||
|
||||
## Context
|
||||
|
||||
Review of the June 4 design doc (Marketing Intelligence Co-Pilot — Lodge-First
|
||||
Launch, A→C→B). Key audit finding: execution diverged from the approved plan.
|
||||
Phase A tools (create_faq, optimize_metadata, web-crawler.ts) were never built;
|
||||
instead June 5–9 shipped the Lodge Brothers beta foundation (tracking links,
|
||||
post_drafts schema, browser AI connection UX, ChatGPT connector). The review
|
||||
ratified the divergence as the new plan of record.
|
||||
|
||||
**URGENT:** Alex validation meeting is 2026-06-11 (tomorrow). Decision D6:
|
||||
Wizard-of-Oz demo pack — full Monday Morning Brief experience choreographed
|
||||
with already-deployed pieces; no overnight code.
|
||||
|
||||
## Vision
|
||||
|
||||
### 10x Check
|
||||
July lodge meeting as a conversion machine, not a show-and-tell: Alex's brief
|
||||
circulates as a printed artifact with QR sign-up; tracked links ping his phone
|
||||
live; lodge members onboard via WhatsApp in the room. The closed loop
|
||||
(draft → WhatsApp approve → publish → tracked click → lead) is the moat — no
|
||||
incumbent (Total Expert, BNTouch, Homebot, Opal) lives inside AI assistants or
|
||||
closes the loop to attributed leads.
|
||||
|
||||
## Scope Decisions
|
||||
|
||||
| # | Proposal | Effort | Decision | Reasoning |
|
||||
|---|----------|--------|----------|-----------|
|
||||
| D3 | Plan of record: Beta spine + competitor intel (Approach C) | M | ACCEPTED | Closed loop is differentiated; research_competitor + generate_report give the "intelligence" story for Paul. create_faq/optimize_metadata dropped for July. |
|
||||
| D4 | Review mode | — | SELECTIVE EXPANSION | Hard July deadline demands rigor; cheap delight items worth surfacing. |
|
||||
| D5.1 | Real-time WhatsApp lead ping (hook in recordClick, rate-capped) | S | ACCEPTED | Visceral "product is alive" moment; Twilio send + bot filter already exist. |
|
||||
| D5.2 | Printable lodge brief + QR sign-up w/ "referred by Alex" attribution | S | ACCEPTED | Makes the "3+ interested members" success criterion measurable rows, not anecdote. |
|
||||
| D5.3 | Second pilot: Alex Ferrari before July | M | ACCEPTED | Two lodge voices > one demo; flushes single-tenant assumptions early. |
|
||||
| D5.4 | Per-post lead attribution table in dashboard | S | VALIDATION-GATED | Mocked version shown at Alex meeting 6/11; build if reaction is strong. |
|
||||
| D5.5 | "Onboard in the room" WhatsApp flow for July meeting | M-L | UNRESOLVED | User dismissed — decide by early July; no slack to build later. |
|
||||
| D6 | Alex meeting 6/11: Wizard-of-Oz demo pack | S | ACCEPTED | Full felt experience, zero overnight code risk; reactions become build priority list. |
|
||||
|
||||
## Accepted Scope (plan of record for mid-July)
|
||||
- Pilot draft cron (weekly Claude API draft generation) — reuse src/billing/cron.ts pattern
|
||||
- WhatsApp approval flow (inbound "1/2/3" → publish)
|
||||
- Lead dashboard (single server-rendered page — scope-balloon risk flagged)
|
||||
- research_competitor + web-search.ts (Serper/Brave key still needed)
|
||||
- generate_report (the Monday Morning Brief renderer)
|
||||
- Real-time WhatsApp lead ping (D5.1)
|
||||
- Printable brief + QR sign-up attribution (D5.2)
|
||||
- Second pilot: Alex Ferrari (D5.3)
|
||||
|
||||
## Dropped from July scope
|
||||
- create_faq, optimize_metadata, SEO audits — commodity features; post-July
|
||||
- IG/FB campaign analytics — platform approval risk; post-July
|
||||
- Dashboard/workflow engine (Phase B) — post-July, CMG-funded
|
||||
|
||||
## Deferred / Unresolved
|
||||
- D5.4 per-post attribution — gated on Alex's 6/11 reaction to the mocked table
|
||||
- D5.5 onboard-in-the-room — unresolved; revisit by early July
|
||||
- Marketplace submissions (ChatGPT GPT Store, Claude.ai) — parallel track, start
|
||||
applications now per 2026-06-09 checklist; long review queues
|
||||
|
||||
## Review Status
|
||||
Step 0 complete (audit, premise challenge, approach D3, mode D4, cherry-picks D5.1–D5.5).
|
||||
Review PAUSED before Sections 1–11 (architecture/error-map/security/etc.) due to
|
||||
urgent Alex meeting prep. Resume with /plan-ceo-review or run /plan-eng-review
|
||||
on the beta spine before building the WhatsApp approval webhook (inbound webhook
|
||||
= new attack surface; needs Twilio signature validation).
|
||||
|
||||
## Key risks carried forward
|
||||
- src/index.ts monolith (2,346 lines, 21 changes/30 days) — new routes should be modules
|
||||
- Social tokens expire ~24h (prior learning) — refresh before ANY demo
|
||||
- Open questions from design doc still unanswered: Alex's platforms, top 3
|
||||
competitors, Paul's specific campaign — capture at 6/11 meeting
|
||||
- MicroK8s TLS cert refresh broken (kubectl exec/logs) — fix before pilot weeks
|
||||
Reference in new issue
Block a user