# Meeting Analysis — IT Planning Session (Full Cross-Reference) **Date:** 2026-05-06 **Participants (planning session):** Garfield Heron, Sean, Logan, Dave Herbst **Additional meetings cross-referenced:** CMG Mortgage SFTP Integration, Q2 Support/Case Management **Vault sources:** 9 notes across CMG Project, BankCMG, Architecture, CMG folders --- ## Critical Finding: The Meeting's Mental Model Is Wrong The planning meeting treated all work as a portfolio of future backlog items competing for limited team capacity. The vault and subsequent meetings reveal the actual state is three simultaneous operational modes requiring completely different management approaches. | Mode | What it is | Planning meeting treated it as | |------|-----------|-------------------------------| | **Stabilization** | Active post-migration remediation — 38 open cases, external transfers double-posting, rate-limiting incident, nickname gap, linked account backlog | Completed / not mentioned | | **Active launch** | AIO June 3 with unconfirmed SweepId fix; Mortgage SSO data file 1–2 weeks out; MANTL soft launch pending | "Ongoing support" | | **Future planning** | Farmers, card platform, SSO, MANTL enhancements | The whole meeting | Collapsing these three into one prioritization conversation is the root error. The meeting skipped Mode 1 entirely, understated Mode 2, and spent all its time on Mode 3. --- ## What the Two New Meetings Reveal ### Meeting A: CMG Mortgage SFTP Integration **The planning meeting said:** *"External Mortgage SSO: Technical solution on hold pending Q2 process, needs further vetting and improvement."* **That characterization is wrong.** The SFTP integration meeting reveals: - **SSO is complete.** When a mortgage account shows up in Q2, clicking the card redirects correctly to the CMG mortgage servicing platform. DevTest 11 is configured and the redirect works. - **The only remaining blocker is a data security governance decision** — not a technical unknown. CMG needs to send a daily batch file (account number, mortgage balance, next payment date, payment amount) to Q2 via GoAnywhere SFTP, but the current setup uses shared human logins at the bank with unknown access roster. - **CMG already has the pipeline built.** An identical job exists for LoanServe data in the CMG mortgage servicing customer experience portal. An EVA resource just needs to activate it. The technical effort is minimal. - **The file is 1–2 weeks from production.** Logan was bringing the data security question to Paul in the same day's call. Once a separate GoAnywhere folder with controlled access is set up (PI/quote in progress), the file goes in and the integration closes. **Revised status:** External Mortgage SSO is 2–3 weeks from closure, not months. It should be removed from "future vetting" and tracked as an active near-term deliverable. **The security concern is legitimate and correct.** Sending 200,000 SSNs to a shared-credential SFTP is an InfoSec violation requiring an exception — and Garfield was right not to proceed unilaterally. The bank using shared GoAnywhere logins is part of the same governance maturity gap identified in the planning meeting (bank team making technical decisions, DocuTech/IDS, Walter's Cluer). It's a pattern. **Alternative approaches discussed but correctly deferred:** - API call to Fiserv (preferred long-term — "if the bank let us put this data on Fiserv, we could do that with an API call...we already know how to do that") — not pursued now to avoid timeline delay - Streaming/pub-sub via Azure/AWS — technically sound for eliminating shared-login risk, but same deferral reasoning **This should be in Garfield's pattern template.** Future integrations should default to API-to-Fiserv over SFTP batch where possible. The SFTP approach is the workaround; the API approach is the right architecture. --- ### Meeting B: Q2 Support / Case Management **38 open cases** confirms the stabilization mode hypothesis. Key findings: **Process failure, not complexity:** - External transfers double-posting: approved for prod April 30, still causing manual corrections. Reason: expectation mismatch — team assumed overnight deployment; actual is 1–2 business days plus CAB approval (twice a week). This is a communication gap, not a technical failure. - Stop pay success messages case: failed testing because CMG is not on the correct HQ/UX version. Q2 sent it to customer testing without verifying CMG's version compatibility. This wasted Draesen's testing time and eroded trust. Q2 is now reviewing all customer testing cases EOD to verify actual readiness before re-sending. **Systemic issue — third-party app URL propagation:** - When CMG migrated from Rob and Bob to Q2, a new URL was assigned. Third-party apps (Tilt, Zelle, Cash App) retain the old URL. Customers get a gray screen when trying to connect Bank CMG accounts in these apps. - This is not an individual customer problem to resolve one-by-one. It requires B2B coordination: Q2 → Plaid → app vendors. - CMG employees should not be calling Zelle or Tilt directly — they lack the technical context and credentials. - **Resolution path:** Q2 escalates to Plaid using B2B leverage; Logan's Plaid rep introduction to Callie and Mickey is the right move. But the systematic URL update outreach needs to be owned by Q2/Plaid, not CMG staff. - This will continue generating support cases until resolved systematically. **IP whitelisting case (04598742) may be the Fiserv rate-limiting fix in limbo:** - Created by IOC team (Q2 Internal Operations Center), assigned to Mickey without her creating it - Ownership unclear — IOC created it, Mickey doesn't recognize it, Sean flagged it as "more of an IT thing" - This maps directly to the April 22 vault incident: Fiserv rate-limiting blocked Q2 employee logins during migration activity. One of the documented resolution steps was to whitelist Q2 integration IPs with Fiserv. - **If this is the whitelist case and it's sitting in limbo with unclear ownership, the Fiserv rate-limiting vulnerability is still unmitigated.** Farmers will hit the same issue. - **Trent and Eric must review and resolve this before Farmers migration work begins.** **Version mismatch risk — more cases may be affected:** - The stop pay case revealed that some cases require a HQ/UX version upgrade to resolve. Engineering is reviewing which JIRA-linked cases fall into this category. - Until that review is done, CMG cannot know which "customer testing" cases will fail for version reasons vs. actual bugs. - Q2's EOD review is the right first step; Garfield should ask for the output. **MANTL soft launch still pending:** - MANTL config is ready in PTE but will not go to production until soft launch approval from Logan/Mickey/Callie. - DSO tile is retail-only; renaming to "consumer account" is recommended for clarity. - This is a decision gate, not a technical gate. **Support transition mechanics confirmed:** - 4-week hypercare with same team (Scott and Philip) - Post-transition: 60–80 support reps, CMG can set case priority directly - Current workaround: add "high" to subject line — Scott will adjust priority on their end --- ## Full Revised Risk Map (All Sources) | Risk | Likelihood | Impact | Source | Status | |------|-----------|--------|--------|--------| | SweepId bug unresolved at AIO June 3 launch | Unknown | **Critical** | Feb 2026 logs + April 16 vault | Unconfirmed fix | | IP whitelisting case in limbo — Fiserv rate-limiting unmitigated | Medium | **Critical** | April 22 vault + case meeting | Case 04598742 unclear ownership | | Farmers repeats linked account gap | High if post-mortem incomplete | **Critical** | April 22 production analysis | Post-mortem not yet complete | | MANTL engineering capacity blocks multiple work items | High | High | May 6 session notes | MANTL on regulatory crunch | | Homepage claims outpace live features | High | High | April 17 analysis | 4 of 8 claims unlivable | | IDS/DocuTech gap compounds existing document issues | High | High | April 22 production + planning meeting | Consciously deferred | | Fiserv rate limiting repeats during Farmers | High if uncoordinated | High | April 22 incident + case 04598742 | Unresolved | | Third-party app URL gap generates ongoing support noise | High | Medium | Q2 support meeting | Needs B2B coordination | | External transfers double-posting deployment timing mismatch | High | Medium | Q2 support meeting | Expectation gap documented | | Panagrosi priorities conversation never gets scheduled | Medium | High | Planning meeting | No owner, no date | | MANTL instance ambiguity causes scope conflict | Unknown | High | April 16 PRD analysis | Unresolved since April 16 | | Version mismatch blocks more customer testing cases | Unknown | Medium | Q2 support meeting | Review in progress EOD today | --- ## Revised Priority Order for Garfield (≥90% Confidence) ### Immediate — no dependencies, start now 1. **Complete the real post-mortem.** Go beyond data accuracy. Must explicitly cover: - Retail linked account gap (authorized users, joint accounts, DBAs — zero detection in current automation) - OLB-layer data gap (nicknames, rights live in Fiserv OLB layer, not in Premier Core) - The three missing reports: Linked Account Impact Assessment, Security Monitoring Plan, Operations Playbook - Fiserv rate-limiting incident (April 22) and the pre-coordination checklist for bulk operations - Rights migration process (Sean's ask from April 28) This is the Farmers pattern foundation. Without it, the template will repeat the mistakes. 2. **Confirm SweepId bug resolution with Q2 before end-of-May AIO pilot.** Binary question: is Q2/Kamino using the correct SweepId (not DDA AccountId) in the sweep API calls? Get written confirmation. If not resolved, AIO cannot go to pilots. 3. **Clarify ownership of IP whitelisting case 04598742.** Trent and Eric need to review this and confirm whether it is the Fiserv whitelist from the April 22 rate-limiting incident. If yes, this must be resolved before Farmers migration bulk operations. If no, the whitelist request still needs to be submitted. ### Near-term — 1–2 weeks 4. **Mortgage SFTP integration — unblock.** Logan's call with Paul resolves the data transfer governance question. Once a separate GoAnywhere folder with controlled access is confirmed, activate the existing EVA job and produce the file. Target: end of next week. If not met, transition to continuous delivery team per the meeting agreement. 5. **MANTL name field gap — get field names confirmed.** Nick/Matt at MANTL should have provided field names via Logan's ticket. Confirm Callie has verified the AIO flow collects middle name/suffix. If not, this is a hard dependency for AIO Phase 1 legal name accuracy. 6. **Build Farmers pattern template** — informed by the complete post-mortem. Must include as non-optional steps: - Retail linked account analysis (request from Fiserv: joint accounts, authorized users, DBAs, trust/POD/TOD) - OLB-layer supplemental data extract (DeAndre/Fiserv, same channel as the nickname fix) - Fiserv security pre-coordination (whitelist IPs, raise rate limits, confirm before bulk operations) - Operations playbook (linked account backlog estimate, fraud monitoring baseline, support call volume estimate) - Rights migration documentation ### After Panagrosi alignment 7. Everything else — SSO (beyond mortgage, which is nearly done), card platform (only after provider chosen), MANTL enhancements (contingent on their regulatory crunch), small business (contingent on vendor limitation vs. config gap answer). --- ## New First-Principle: The Planning Meeting Got the External Mortgage SSO Status Wrong This is worth isolating because it directly affects how Garfield communicates progress to leadership. **What the planning meeting said:** External Mortgage SSO is "on hold pending Q2 process, needs further vetting and improvement." **What is actually true:** - SSO redirect: complete and working - Technical pipeline for the data file: already built (LoanServe analog) - Remaining work: (a) security governance decision on SFTP access controls — Paul call, same day; (b) activate existing EVA job; (c) separate GoAnywhere folder — PI and quote in progress - Timeline to closure: 2–3 weeks, not quarters **Why this matters:** If Garfield or Sean communicates to Kit and Paul using the planning meeting's characterization, they will significantly misrepresent the project state. This item is nearly done and should be surfaced as such. --- ## Structural Pattern Across All Meetings Every meeting in this project reveals a version of the same underlying dynamic: **The bank is modernizing in real time, and technical decisions are being made before governance structures exist to support them.** - Shared GoAnywhere credentials → InfoSec doesn't control access - IDS instead of DocuTech → customer portal disclosures not available - Q2 employee login hard-coupled to Fiserv → no graceful degradation - Third-party apps not notified of URL change → ongoing customer-facing failures - Stale Fiserv extracts driving training on wrong data → day-one errors - Retail linked accounts not in migration scope → post-migration backlog In each case, the team identifies the right answer technically (separate SFTP folder, DocuTech, IP whitelist, B2B URL coordination, OLB-layer extract, retail linked account analysis) but encounters a governance gap — wrong team owns the decision, no one has the authority, or the decision is deferred as "day two." The planning meeting's pattern template work is the right response to this — but only if the templates explicitly include governance checkpoints (who owns InfoSec sign-off, who owns vendor coordination, who owns the Fiserv pre-notification) and not just technical migration steps. --- ## Open Questions (Consolidated, All Sources) | Question | Why it matters | Owner | |----------|---------------|-------| | Is the SweepId bug fixed? | AIO June 3 launch go/no-go | Garfield → Q2 | | Is case 04598742 the Fiserv IP whitelist? | Farmers rate-limiting risk | Trent + Eric | | MANTL instance: same or separate? | Scope of MANTL enhancement work | Aaron Landers / Logan | | Has Paul been told 4 of 8 homepage claims are unlivable? | CSO credibility risk at launch | Logan / Kelly | | What is the current linked account backlog count? | Operational health post-migration | Mickey / Trent | | Are e-statements fully resolved? | Post-go-live issue #001 | Eddie / Q2 | | Has DeAndre (Fiserv) responded on nickname supplemental extract? | Customer impact still open | Garfield → DeAndre | | Farmers acquisition exact closing date? | Pattern template urgency | Dave Herbst / Sean | | Which additional cases are blocked by HQ/UX version mismatch? | Prevents wasted testing effort | Q2 EOD review → Scott | | Does Q2's B2B Plaid relationship cover Tilt/Zelle URL update? | Systematic fix vs. case-by-case | Q2 / Logan's Plaid rep | | Is the post-migration support dashboard running? | Early warning system for issues | Trent | | When is the MANTL soft launch decision? | Blocks MANTL PTE → prod promotion | Logan / Mickey / Callie | --- *Cross-referenced: 9 vault notes (April 16 – May 6, 2026) + 2 new meeting transcripts (CMG Mortgage SFTP Integration, Q2 Support/Case Management).* *Supersedes all prior versions of this note.* ## Additional Meeting: Q2 Support Standup (Earlier Session) — Corrections & New Findings *This section corrects one error from the prior analysis and adds new findings from an earlier Q2 support standup.* --- ### Correction: Case 04598742 Is NOT the Fiserv Rate-Limiting Whitelist The prior analysis flagged case 04598742 as possibly being the Fiserv whitelist from the April 22 rate-limiting incident. **That was wrong.** This meeting clarifies what 04598742 actually is: Q2's IOC (Internal Operations Center) opened it to verify whether CMG has configured **Q2-side IP restrictions** — branch access control limiting which IP addresses can reach Q2's platform. Rebecca (Q2 IOC) reviewed the firewall and confirmed: *"currently no services restricted and no IPs added."* She is asking CMG and RSM to decide whether they want restrictions and what IPs/URLs to configure. This is an access hardening question, not a Fiserv rate-limiting fix. Garfield noted branches may have been whitelisted before — RSM (Chris) needs to confirm what IP whitelisting was previously set up and whether Q2-side restrictions are needed. **Consequence:** The Fiserv rate-limiting whitelist from the April 22 incident (Q2 integration IPs whitelisted with Fiserv to prevent login failures during bulk operations) is a **separate, still-untracked item**. That fix was documented in the vault as a resolution step but no case number was recorded for it. Before Farmers, this needs to be confirmed as completed through a direct conversation with Fiserv — not through case 04598742. **Revised risk:** Case 04598742 needs Trent/Eric/CMG to decide on Q2-side access restrictions — a security posture choice. The Fiserv rate-limiting vulnerability remains an open question to be confirmed separately. --- ### New Finding: Train Code Migration Artifact (RDC) Merchant remote deposit capture items are appearing with train code **08** instead of **09**, causing transactions to appear as "forced reopen" on statements. Timeline confirmed in the meeting: - Pre-go-live (April 16–17): only train code 9 appearing - Post-go-live: train codes flipped to 8 Root cause is unknown — possibly a configuration change during the migration process. Scott to submit removal of codes 8 and 118 (keep only 9 and 109) to engineering. Expected fix: 3–4 days through PTE then prod. **Why this matters for Farmers:** This is a migration-induced data classification corruption that was not caught in pre-launch validation because the codes appeared correct before go-live. The Farmers pattern template must include a **post-cutover transaction classification audit** — not just data completeness checks. Something in the migration process silently changed operational codes. Knowing what caused the flip (Brian to investigate) is directly applicable to Farmers preparation. **Related: RDC missing images.** The "More Detail" tab doesn't exist for merchant remote deposits or mobile deposit, meaning images are not viewable. A prior closed case existed for Tran codes 9/109 and image display — possibly connected. Escalated. --- ### New Finding: Recurring Transfers Are a Larger Problem Than One Case Transfers that had **expired on Fiserv core before the migration cutover** did not migrate to Q2 — and critically, they also **did not appear on exception reports**. This means: - The exception reporting system has a silent gap: it doesn't surface "transfers that expired before migration" - Multiple clients have loan payments and rent payments failing to process - Real customer harm: one client's internal rent transfer was two days late; landlord wants $200 late fee as a bank error - Brian assigned to investigate **For Farmers:** The migration validation framework must explicitly query for expired/pending recurring transfers in the Fiserv core extract. "Expired" ≠ "doesn't need to be accounted for" — many customers configure recurring transfers with end dates or limited occurrences. The exception reporting system will not catch these silently if they expired before cutover. --- ### New Finding: ClickSwitch Positive Development The simple fix for ClickSwitch is working in basic tests. **CMG may not need to unmask account numbers to proceed with ClickSwitch.** This simplifies the open masking decision: the Q2 enhancement (show last 4 digits, click-to-reveal full number) can wait for Q2's target delivery in Q2 without blocking ClickSwitch rollout. If ClickSwitch validates without full unmasking, the masking enhancement becomes a UX improvement rather than a blocker. Final validation pending before production push. --- ### New Finding: Case Categorization Calibration Scott's assessment: approximately **one-third / one-third / one-third** breakdown of the 38 open cases: | Third | Type | Implication | |-------|------|-------------| | ~13 cases | Genuine post-migration bugs | Q2 engineering must fix | | ~13 cases | Change/enhancement requests | CMG changed requirements post-launch (e.g., masking → unmasking) | | ~13 cases | Missed during testing | Shared responsibility | This is important context for the pending meeting with Mary. The support burden is not entirely Q2's failure — roughly one-third of cases represent CMG deciding differently after go-live. Mickey's decision to scrub cases first (are we waiting on CMG or Q2?) before scheduling the Mary meeting is the right call. --- ### New Finding: FTP Restrictions Progress Garfield submitted an internal report on the SFTP connection issues (separate from the GoAnywhere mortgage data transfer question). The case has been passed to another team to coordinate a technical resource who can work directly with RSM's Seth. No resolution yet but directional movement confirmed. This is the persistent SFTP connectivity issue where different Q2 groups keep asking CMG the same validation questions repeatedly — escalated to Mary. --- ### New Finding: Kathleen Weiss Pattern — User Type Migration Bug A user was moved from retail to business in Q2 (has business accounts), then moved back to retail. She now cannot access retail bill pay and gets a black screen error identical to the go-live bill pay outage. Engineering investigating whether the retail → business → retail movement corrupted her user state. **Pattern implication:** User type changes in Q2 post-migration may have unintended side effects on access entitlements. Any customer who had their user type changed (retail ↔ business) during or after migration should be flagged for validation. This is likely not a one-off — wherever the bank made user type reassignments for customers with mixed account types, similar bill pay black-screen issues may exist silently. --- ### Revised Operational Picture **What "38 open cases" actually means:** - ~13: Q2 bugs to fix (train codes, RDC images, recurring transfers, message groups, DDLs) - ~13: CMG-originated changes (masking/unmasking, business enrollment UX, accessibility) - ~12: Testing gaps (stop pay version mismatch, business enrollment notifications, user type migration) **The support pace issue is real but partly self-inflicted.** All clients are now live — there is no phased rollout buffer. Every delay is customer-facing. But ~1/3 of the cases are CMG changing direction post-launch, which is not a Q2 execution problem. Mickey's instinct to separate "waiting on CMG" from "waiting on Q2" before escalating to Mary is analytically correct. **Standard resolution timeline confirmed:** Day 1 submit → Day 2 engineering overnight → Day 3 verify PTE → Day 4 push prod (3–4 days, sometimes 2–3 if first fix is correct). Holiday impact: May 1 is a holiday in India — no overnight resources available for that cycle. --- ### Updated Open Questions | Question | Update from this meeting | |----------|------------------------| | Is case 04598742 the Fiserv whitelist? | **No** — it's Q2-side IP restriction config. Fiserv whitelist is a separate untracked item. | | What caused train code to flip 9→8? | Unknown — Brian to investigate. Pre-go-live = 9, post-go-live = 8. | | How many clients are affected by recurring transfer failures? | More than one — loan payments and rent payments failing for multiple clients. | | Is ClickSwitch blocked by account masking? | Likely not — simple fix working in basic tests. | | What % of open cases are CMG-originated changes vs. Q2 bugs? | ~1/3 each: bugs / CMG changes / testing gaps. | ## New Meeting: AIO Product Go-Live Readiness — Critical Updates *Participants: Sean, Becky, Dave, Logan, Mickey, Callie, Carrie, Lisa, Derek, Kerry, Aaron* *This is the business/product planning side of AIO — distinct from IT support meetings.* --- ### AIO Is More Imminent Than the Infrastructure Analysis Assumed The IT planning meeting and support meetings were treating AIO as a future workstream. This meeting reveals it is targeting **soft launch: late May** and **integrated/MANTL launch: June** (post-June 3 MANTL delivery). That is weeks away, not months. Every unresolved technical issue identified in the prior analysis is now on a much shorter fuse. --- ### Two Confirmed Hard Blockers for Full Launch | Blocker | Status | Owner | |---------|--------|-------| | Terms and conditions (Wolters Kluwer) | In progress, expected within couple weeks | Carrie / Beth + Wolters Kluwer | | Loan onboarding template (Fiserv) | No response yet — "biggest sticking point" | Carrie to re-email Fiserv contact | Everything else is either complete or can proceed without blocking launch. The loan onboarding template is flagged as having no automated backup — if the Fiserv contact doesn't deliver, the team needs a manual file-building plan ready. All other documentation items: - Deposit agreement/feature sheet: Lisa completing in next 1–2 days - Auto payment draft (Texas Homestead): Complete - Email language for checking account link: Through CMG compliance, awaiting Shannon/legal review - Credit agreement update: With CMG legal, who is "buried" — Sean to provide ETA when received --- ### Critical Clarification: Wolters Kluwer ≠ IDS/DocuTech There was confusion in the meeting between Fiserv, Wolters Kluwer, and disclosure systems. Clarified: - **Wolters Kluwer** provides all retail deposit documentation (paper and electronic) for the AIO Checking account. In MANTL, customers review T&C via links on the review/submit page; documents are emailed after submission. Risk and compliance require finalized Wolters Kluwer documentation before full launch. - **Fiserv has nothing to do with** the AIO Checking T&C — Carrie explicitly corrected this in the meeting. **What this means for the IDS/DocuTech concern from the planning meeting:** Logan's IDS concern (no remote online notary, no customer portal disclosures) is about a *different* document flow — post-account disclosures and the customer portal experience, not MANTL account-opening T&C. These are separate systems for separate purposes. The MANTL onboarding disclosure path (Wolters Kluwer) appears to be working. The customer portal disclosure gap (IDS vs. DocuTech) remains a concern for the portal experience but does not block AIO Checking launch via MANTL. --- ### Zelle/PayPal/Venmo Zero-Balance Test — Not Yet Done Debit card functionality has been confirmed working with a zero-balance checking account. **Zelle, PayPal, and Venmo have not been tested.** Callie assigned to test these. **Why this matters:** At Merchants Bank (the predecessor product), the core system did not read available loan balance in real-time — customers had to manually push money from the loan to checking before using third-party payment apps. If Bank CMG has the same real-time balance visibility issue, customers will see declines when checking sits at zero, defeating a core product experience promise. This test needs to happen before soft launch, not after. --- ### Transfer Mechanics Confirmed and Locked After a longer discussion and alignment across Sean, Becky, Dave, Mickey, Callie, Derek: - **Loan side:** Manual transfers in/out **disabled**. Automated end-of-day sweep only. - **Checking side:** Transfers out to other accounts (money market, kids accounts, etc.) **allowed**. - **Texas Homestead exception:** No auto sweep whatsoever. Customer manually schedules transfers and advances. Texas state regulations on equity access on primary residence make auto sweep impractical. - **Interest:** Calculated at end of day after all debits and credits settled. - **Advance from loan to checking:** Not allowed in standard product. Customer adjusts threshold balance instead. A demo was requested (not today) for Mickey, Logan, and others to visualize the mechanics clearly before launch. **Unresolved from prior analysis:** Nobody in this meeting confirmed whether the **SweepId API bug** (Q2/Kamino using DDA AccountId as SweepId) has been fixed. The transfer mechanics are now locked at the product level, but the technical implementation of the sweep mechanism remains unconfirmed as working. --- ### Organizational Change: Dedicated AIO Team Under Bridget Becky announced a significant structural change: Bridget (start date **May 18th**) will lead a dedicated team owning all AIO account opening, servicing, and call handling. This team will be specialized exclusively on AIO rather than part of the general call center. - Bridget will bring on additional resources; team may use a facility or work from home - Soft launch timing may push slightly to allow Bridget to get oriented before rollout - Sean already confirmed as volunteer test customer — can still proceed before Bridget arrives if needed - Team visiting week of May 18th for kickoff **Implication:** The late May soft launch target essentially coincides with Bridget's first week. If the T&C from Wolters Kluwer takes the full "couple weeks," that puts it right at the May 18 window. --- ### Branch 47 — New Structural Decision A dedicated Branch 47 is being created to house all AIO depository and loan accounts. Benefits: - Pull a single branch in reporting instead of filtering by product type across multiple locations - Track referrals specific to AIO - Monitor activity cleanly Carrie already working on this setup. Dave Panagrosi liked it when Becky presented it to him. This is a clean operational decision that simplifies AIO program monitoring. --- ### Day Two Items Confirmed | Item | Status | |------|--------| | Combined statements | Pushed to parallel track — vendor challenges, multiple vendors contacted. Will not block launch. | | Daily minimum balance sweep | Day two. Still resolving issues with Fiserv. Want to fix while Fiserv project team available. | | Investor engagement (Western Alliance Bank) | "Probably a ways off still" — many steps remaining | --- ### Go-Live Readiness Summary (as of this meeting) | Item | Status | |------|--------| | MANTL integration | June 3rd (UAT included). Plan B available (loan officer sends link manually). | | AIO checking link | Available now — can manually email to customers without waiting for pre-fill | | Transfer mechanics | Confirmed locked | | Debit card (zero balance) | Confirmed working | | Zelle/PayPal/Venmo (zero balance) | **Not yet tested — Callie to test** | | Terms and conditions | **BLOCKER** — Wolters Kluwer, couple weeks | | Loan onboarding template | **BLOCKER** — no response from Fiserv contact | | Feature sheet | 1–2 days (Lisa) | | Email language for checking link | CMG compliance done; awaiting Shannon/legal | | Credit agreement | With CMG legal (buried) | | SweepId API bug resolution | **Unknown — not confirmed in any meeting** | | Call center readiness | Bridget starting May 18; specialized team being built | --- ### Revised Priority Additions for Garfield - **Zelle/PayPal/Venmo zero-balance test must happen before soft launch.** This is not a stretch-goal test; it validates whether the core product premise works with third-party payment apps. Callie is assigned but Garfield should be aware of the result. - **SweepId bug confirmation is now on a late-May timeline, not a June 3 timeline.** With soft launch targeting late May and Sean as the first test customer, the sweep mechanism must be confirmed working before that date. - **The IDS/DocuTech concern does NOT block MANTL AIO Checking launch** — Wolters Kluwer handles MANTL T&C independently. However, it still matters for the customer portal experience post-account opening.