Files
conversation-history/SquareMCP/2026-06-10-ceo-plan-lodge-first-launch.md
T

79 lines
4.6 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
status: ACTIVE
---
# CEO Plan: Lodge-First Launch — Beta Spine + Competitor Intel
Generated by /plan-ceo-review on 2026-06-10
Branch: main | Mode: SELECTIVE EXPANSION
Repo: garfield/hermes-mcp (git.fetcherpay.com)
## Context
Review of the June 4 design doc (Marketing Intelligence Co-Pilot — Lodge-First
Launch, A→C→B). Key audit finding: execution diverged from the approved plan.
Phase A tools (create_faq, optimize_metadata, web-crawler.ts) were never built;
instead June 5–9 shipped the Lodge Brothers beta foundation (tracking links,
post_drafts schema, browser AI connection UX, ChatGPT connector). The review
ratified the divergence as the new plan of record.
**URGENT:** Alex validation meeting is 2026-06-11 (tomorrow). Decision D6:
Wizard-of-Oz demo pack — full Monday Morning Brief experience choreographed
with already-deployed pieces; no overnight code.
## Vision
### 10x Check
July lodge meeting as a conversion machine, not a show-and-tell: Alex's brief
circulates as a printed artifact with QR sign-up; tracked links ping his phone
live; lodge members onboard via WhatsApp in the room. The closed loop
(draft → WhatsApp approve → publish → tracked click → lead) is the moat — no
incumbent (Total Expert, BNTouch, Homebot, Opal) lives inside AI assistants or
closes the loop to attributed leads.
## Scope Decisions
| # | Proposal | Effort | Decision | Reasoning |
|---|----------|--------|----------|-----------|
| D3 | Plan of record: Beta spine + competitor intel (Approach C) | M | ACCEPTED | Closed loop is differentiated; research_competitor + generate_report give the "intelligence" story for Paul. create_faq/optimize_metadata dropped for July. |
| D4 | Review mode | — | SELECTIVE EXPANSION | Hard July deadline demands rigor; cheap delight items worth surfacing. |
| D5.1 | Real-time WhatsApp lead ping (hook in recordClick, rate-capped) | S | ACCEPTED | Visceral "product is alive" moment; Twilio send + bot filter already exist. |
| D5.2 | Printable lodge brief + QR sign-up w/ "referred by Alex" attribution | S | ACCEPTED | Makes the "3+ interested members" success criterion measurable rows, not anecdote. |
| D5.3 | Second pilot: Alex Ferrari before July | M | ACCEPTED | Two lodge voices > one demo; flushes single-tenant assumptions early. |
| D5.4 | Per-post lead attribution table in dashboard | S | VALIDATION-GATED | Mocked version shown at Alex meeting 6/11; build if reaction is strong. |
| D5.5 | "Onboard in the room" WhatsApp flow for July meeting | M-L | UNRESOLVED | User dismissed — decide by early July; no slack to build later. |
| D6 | Alex meeting 6/11: Wizard-of-Oz demo pack | S | ACCEPTED | Full felt experience, zero overnight code risk; reactions become build priority list. |
## Accepted Scope (plan of record for mid-July)
- Pilot draft cron (weekly Claude API draft generation) — reuse src/billing/cron.ts pattern
- WhatsApp approval flow (inbound "1/2/3" → publish)
- Lead dashboard (single server-rendered page — scope-balloon risk flagged)
- research_competitor + web-search.ts (Serper/Brave key still needed)
- generate_report (the Monday Morning Brief renderer)
- Real-time WhatsApp lead ping (D5.1)
- Printable brief + QR sign-up attribution (D5.2)
- Second pilot: Alex Ferrari (D5.3)
## Dropped from July scope
- create_faq, optimize_metadata, SEO audits — commodity features; post-July
- IG/FB campaign analytics — platform approval risk; post-July
- Dashboard/workflow engine (Phase B) — post-July, CMG-funded
## Deferred / Unresolved
- D5.4 per-post attribution — gated on Alex's 6/11 reaction to the mocked table
- D5.5 onboard-in-the-room — unresolved; revisit by early July
- Marketplace submissions (ChatGPT GPT Store, Claude.ai) — parallel track, start
applications now per 2026-06-09 checklist; long review queues
## Review Status
Step 0 complete (audit, premise challenge, approach D3, mode D4, cherry-picks D5.1–D5.5).
Review PAUSED before Sections 1–11 (architecture/error-map/security/etc.) due to
urgent Alex meeting prep. Resume with /plan-ceo-review or run /plan-eng-review
on the beta spine before building the WhatsApp approval webhook (inbound webhook
= new attack surface; needs Twilio signature validation).
## Key risks carried forward
- src/index.ts monolith (2,346 lines, 21 changes/30 days) — new routes should be modules
- Social tokens expire ~24h (prior learning) — refresh before ANY demo
- Open questions from design doc still unanswered: Alex's platforms, top 3
competitors, Paul's specific campaign — capture at 6/11 meeting
- MicroK8s TLS cert refresh broken (kubectl exec/logs) — fix before pilot weeks